Post Update as of November 25, 2021; 10:50AM
UNSCHEDULED POWER INTERRUPTION
Affected: Areas covered by Feeder 14-1
Power restored: 08:38AM
Cause: Primary jumper wire cut down at ECA Building, National Highway, GSC.
Affected: Areas covered by Feeder 14-2
Power restored: 08:45AM
Cause: Damaged suspension insulator along Guinto Street, San Isidro, GSC.
We apologize for the inconvenience this may have caused.
For Information.
Thank you.
Previous Post:
Power Update as of November 25, 2021; 08:35AM
UNSCHEDULED POWER INTERRUPTION
Affected:Areas covered by Feeder 14-1
Time of interruption: 07:06AM
Areas covered by Feeder 14-2
Time of interruption: 07:38AM
Status: On going line restoration works.
We appeal for you utmost understanding.
For Information. Thank you.